Watermain Replacement, Burnage,Manchester
Works carried out as subcontractor: -
  • Scan area of excavation for existing pipework and cabling etc
  • Excavate ground by hand to ensure no damage to existing services to a depth of 850mm
  • Install new Alcathene watermains and back fill
  • Break through foundation of properties and install new stop tap for connection to internal plumbing by others and make good to floor and foundations
  • Leave blanked end of watermain in position at boundary for connection by the water board.
  • Reinstate ground work and make good finishes including relaying of tarmac, flagging or lawns/gardens etc.

    Client : Manchester City Council. City Works, Pink Bank Lane, Belle Vue,
    Manchester M12 5QN
    Approximate value for previous 3 contracts: £200,00.00. Plus. (New contract on going)