Works carried out as Principal and subcontract contractors:
- Replacement of lead to several code 5 dormers. Replacement of lead gutters from code 5 and code 7. Replacement of several flat roofs from codes 5 to codes 8 and code 5 vertical mansards.
- Repairs to terracotta facades and cupolas, pointing of brickwork to facades and elevations.
- Replacement of cast iron rainwater goods and soil stacks etc.
- Replacement of supporting steel to cupolas.
- Dry rot eradication within Floors and walls.
- Redecoration to windows and cast iron goods.
- Plumbing works to hotel facilities.
- Gas pipework alterations to incoming main (carried out during the night)
Value of works: Approximately £5,00000.00
Carried out over several contracts within the last 10 years
Average size of contacts: from £10,000.00 - £230,000.00
Architect: B M Partnership, Architects, Deansgate, Manchester
Client: Holiday inn, Crown Plaza, Midland Hotel, Manchester