Contracting
J.Hempstock & co Ltd carry out works as Principal contractor with works generally being of a historical nature requiring knowledge of lead substrate design.
Several contracts have been carried out covering all areas off refurbishment and using many specialist subcontractors. When carrying out this type of work it often becomes necessary to work closely with the Architect or specifier to assist and overcome challenging design difficulties ensuring compliance with all relative codes of practice and regulations.
A small selection of contracts carried out as principal contractor are as follows:
- Buxton Opera House, Water Street Derbyshire (Case Study)
- Midland Hotel, Peter Street. Manchester (Case Study)
- St Mary and All Saints Church, Chesterfield (Case Study)
- Caernarfon Castle, Caernarfon, North Wales (Current)
